Industries · Utilities

Control high-risk infrastructure work, on site and in the field.

Permit-to-work and isolation procedures, lone-worker safety, mobile asset and field inspections that work with no signal, and contractor competency gating — with evidence the regulator accepts unedited.

Built for ISO 45001, ISO 55001 asset management, ISO 14001, and regulatory reporting

Wind turbines across a field at sunset

For work where the margin for error is zero.

Permit-to-work & isolation

High-voltage, confined-space, and excavation permits with isolation and lockout steps, approval gates, and e-signed handback.

Lone & field worker safety

Procedures and check-ins for crews working alone or remotely, with the JSA signed before the task starts.

Asset lifecycle & inspection

Commissioning to decommissioning on one spine. A failed inspection or lapsed calibration demotes the work that depends on the asset.

Offline field inspections

Phone-first inspections on substations, pipelines, and remote sites that capture and sync on reconnect — photos with EXIF, signatures on glass.

Contractor competency

Approved-contractor list with insurance, certifications, and scope. Lapsed credentials block permit issue and remove crews from eligible lists.

Regulatory reporting

Incidents, audits, and environmental events roll into board-ready and regulator-ready exports with the chain proof embedded.

Authorize. Isolate. Inspect. Report.

  1. 1

    Authorize

    Issue permits with isolation steps and competency gates before any high-risk work starts.

  2. 2

    Work

    Crews run JSAs and check-ins; EHS inspects assets and field sites on a phone, offline.

  3. 3

    Resolve

    Failed inspections and incidents open findings and CAPAs linked to the asset.

  4. 4

    Report

    Export regulator- and board-ready evidence with chain proof in one click.

What this satisfies

  • ISO 45001
  • ISO 55001 asset mgmt
  • ISO 14001
  • Regulatory reporting

"Shape" means we mirror the regulation's evidence, signature, and audit-trail requirements in our data model. See Trust & Security for the current certification state.

For high-voltage work the permit and the isolation evidence have to be perfect. Our auditor re-derived the chain on his own laptop and stopped asking for screenshots.
HSEQ ManagerWater & energy utility, regional network

Forge better processes

One platform. Always audit-ready.

Bring SOPs, checklists, audits, incidents, and CAPAs into one connected system for safer, clearer, and more consistent operations.

No credit card required · Built for teams that run on process